Audi A4, S4

Since 2000 of release

Repair and car operation



Audi A4, S4
+ Introduction
+ Controls and receptions of safe operation
+ Current leaving and service
+ The engine
+ Systems of cooling, heating and the air conditioner
+ Power supply systems, release and decrease in toxicity of the fulfilled gases
+ Systems of an electric equipment of the engine
+ Manual box of a gear change
+ Automatic transmission
+ Coupling, power shafts and differential
+ Brake system
+ Suspension bracket and steering
- Body
   The general data and security measures at carrying out кузовных works
   Cleaning and leaving
   Repair of insignificant damages кузовных panels
   Repair of considerable damages of a body
   - The external equipment
      Installation of the forward panel in position for maintenance service
      Removal and installation of a cover of a water modular compartment
      Removal and installation of a forward bumper
      Removal and installation локера a back wing
      Removal and installation локера a forward wing
      Removal and installation of a forward wing
      Removal and installation of a back bumper
      Removal and cowl installation/adjustment
      Removal and installation of a cable of a drive of a cowl
      Removal and installation of a clamp of the lock
      Removal and installation of facing of a forward door
      Removal and installation of facing of a back door
      Removal and door installation
      Door adjustment
      Removal and installation of a frame of a window of a forward door
      Removal and installation стеклоподъёмника
      Removal and installation of the electric motor of a drive стеклоподъёмника
      Removal and installation of the lock of a door
      Removal and installation of the handle of a door
      Removal and installation of the cylinder of the lock of a door
      Removal and installation of facing of a cover of a luggage carrier
      Removal, installation and adjustment of a cover of a luggage carrier
      Removal and installation of the lock of a luggage carrier
      Removal and installation of facing of a door of a back (Versatile person)
      Removal and installation of a door of a back (Versatile person)
      Removal and installation of the lock of a door of a back (Versatile person)
      Removal and installation of an external mirror
      Removal and installation молдингов
      Removal, installation and check сдвижной roof panels
      Removal and overlay installation сдвижной roof panels
      Check and starting position adjustment сдвижной roof panels
      Removal and sealant installation сдвижной panels
      Replacement of elastic bands of brushes of a screen wiper
      Removal and jet installation стеклоомывателя a windscreen
      Removal and installation of a jet of a washer of back glass
      Removal and installation of the lever of a cleaner of a windscreen
      Removal and installation of the lever of a cleaner of back glass
      Removal and installation of jets фароомывателя
      Adjustment of levers of a screen wiper
   + The salon equipment
+ Onboard electric equipment






Check and starting position adjustment сдвижной roof panels

Electric motor installation сдвижной panels in a starting position

 PERFORMANCE ORDER

  1. Close сдвижную the panel.
  2. Remove a forward ceiling plafond, address to Section Removal and installation of plafonds of internal illumination.
  3. Turn away screws of fastening and remove the electric motor сдвижной panels.
  4. Electric wires of the electric motor do not disconnect.
  5. Include ignition.
  6. Establish the rotary switch position «the Roof it is closed». Thus the electric motor works automatically and stops in zero position.
  7. In this position establish the electric motor at the closed roof and fix it.
  8. Establish a forward plafond.

Starting position check кулисной the directing

 PERFORMANCE ORDER

The starting position can be checked up by means of a pocket mirror and a pocket lantern at established сдвижной panels.

  1. Remove lateral overlays at the left and on the right, address to corresponding Section.
  1. Open and again close сдвижную the panel.
  1. Shift the ceiling panel completely back.
  1. Put on сдвижную the panel a pocket mirror and check up a starting position. At correct installation a rectangular groove in the promotion mechanism кулисной directing (1) should coincide with a groove (an arrow on an accompanying illustration). Otherwise make adjustment.

Installation of a directing side scene in a starting position

 PERFORMANCE ORDER

  1. Remove сдвижную the panel.
  2. Remove the panel electric motor.
  3. Remove lateral overlays, address to corresponding Section.
  4. Displace кулисные directing (1) from both parties from back position forward.
  5. Establish a rectangular groove in the promotion mechanism кулисной directing (1) so that it coincided with a groove (marksman) on the directing tyre (2) panels of a ceiling. Thus the starting position of a directing side scene is established.
  6. Establish the electric motor сдвижной panels in a starting position.
  7. Establish lateral overlays.


home